做模具出口的,這100句模具常用英語你用到了嗎? (3)

日期: 2020-09-04  來源:51模材  點擊數:  


82. Sufficient stroke as well as part andrunner falls clear. 是否有足夠的行程使品和流道脫落?


83. Spring around return pins and pressratio<33? 是否有回針的彈簧及其壓縮比(<33%)?


84. Special instruction stamped on top andoperator side?客戶如有特別指示請打在模坯頂及操作面上,有否完成?


85. Screws tight and all installed?螺絲是否全部收緊?


86. Support posts ground and screwed toclamp plate and pre-loaded. 撐頭是否高出方鐵?


87. Spring pockets correct depth , springdeflection max.40%?全部彈弓壓縮比是否為1/3 ?


88. Standing steel well supported?成品與內模之間的鋼材是否足夠?


89. Single drop of cold sprue gating isdesigned after moldflowanalysis, which ensures a balance flow of plastic andeasy for moulding. 用moldflow分析決定產品的入水位置,使膠料分流平均,易于注塑。


90. Self-degating whenever possible .Hotrunner system should beconsidered.…… 熱流道系統應該加以考慮。



91. Standard components should be used. 盡量使用標準件。


92. Semi-automatic and use of mould releaseacceptable. 半自動工手放鑲件也可。


93. Update title block/revision. 更新標題欄/版本。


94. Use standard components whenappropriate. 適當的時候使用標準件。


95. View of deepest point 最深點(位置)的剖切視圖


96. Water circuits should run out form theejection box. 運水應從出水槽中流出。


97. Waterlines clear tie bar and clampslot? 運水是否同哥林柱和模槽有沖突?


98. Will mould fit in quoted press? 可否配合客戶啤機?


99. Waterlines clear tie bars. 運水喉咀接駁位要離開啤機呵林柱咀接駁。


100. Waterline clear clamp slot. 運水喉咀接駁位要離開啤機碼???。


41.9K

最新文章

色综合天天综合天天综_国产思思精品视频_日本少妇高潮pics_黄频国产免费高清视频_亚洲真人无码永久在线